Tingnan lahat

Mangyaring sumangguni sa bersyon ng Ingles bilang aming opisyal na bersyon.Bumalik

Europa
France(Français) Germany(Deutsch) Italy(Italia) Russian(русский) Poland(polski) Czech(Čeština) Luxembourg(Lëtzebuergesch) Netherlands(Nederland) Iceland(íslenska) Hungarian(Magyarország) Spain(español) Portugal(Português) Turkey(Türk dili) Bulgaria(Български език) Ukraine(Україна) Greece(Ελλάδα) Israel(עִבְרִית) Sweden(Svenska) Finland(Svenska) Finland(Suomi) Romania(românesc) Moldova(românesc) Slovakia(Slovenská) Denmark(Dansk) Slovenia(Slovenija) Slovenia(Hrvatska) Croatia(Hrvatska) Serbia(Hrvatska) Montenegro(Hrvatska) Bosnia and Herzegovina(Hrvatska) Lithuania(lietuvių) Spain(Português) Switzerland(Deutsch) United Kingdom(English)
Asya/Pasipiko
Japan(日本語) Korea(한국의) Thailand(ภาษาไทย) Malaysia(Melayu) Singapore(Melayu) Vietnam(Tiếng Việt) Philippines(Pilipino)
Africa, India at Gitnang Silangan
United Arab Emirates(العربية) Iran(فارسی) Tajikistan(فارسی) India(हिंदी) Madagascar(malaɡasʲ)
Timog Amerika / Oceania
New Zealand(Maori) Brazil(Português) Angola(Português) Mozambique(Português)
Hilagang Amerika
United States(English) Canada(English) Haiti(Ayiti) Mexico(español)
BahayMga ProduktoDevelopment Board, Kit, ProgrammersPagsusuri Boards - Audio AmplifiersTPA6011A4EVM
TPA6011A4EVM Image
Ang imahe ay maaaring representasyon.
Tingnan ang mga pagtutukoy para sa mga detalye ng produkto.
IPAHAYAG ANG PAGPIPILIAN
Paraan ng Pagbabayad

TPA6011A4EVM - Texas Instruments

Manufacturer Numero ng Bahagi
TPA6011A4EVM
Manufacturer
Texas Instruments
Allelco Numero ng Bahagi
98D-TPA6011A4EVM
Garantiya
1 taong Allelco Warranty - Alamin ang higit pa
Mga Deskripsyon ng Mga Bahagi
EVAL MOD FOR TPA6011A4
Package
Box
Data sheet
1.TPA6011A4EVM.pdf ...

HTML Datasheet

TPA6011A4.pdf
Ang aming sertipikasyon
Sa stock: 42945
  • Presyo ng isang piraso: $58.80
  • Subtotal: $0.00

Gusto mo ng isang mas mahusay na presyo?
Idagdag sa CART at Isumite ang RFQ ngayon, makikipag -ugnay kami kaagad sa iyo.

Dami Presyo ng isang piraso Ext.Presyo
1+ $58.80 $58.80
Ang mga presyo sa itaas ay hindi kasama ang mga buwis at mga rate ng kargamento, na kinakalkula sa mga pahina ng order.
IPAHAYAG ANG PAGPIPILIAN
Paraan ng Pagbabayad
Ang aming sertipikasyon

Mga pagtutukoy

Mga pagtutukoy ng TPA6011A4EVM Tech
Texas Instruments - TPA6011A4EVM Teknikal na Mga Pagtukoy, Mga Katangian, Mga Parameter at Mga Bahagi na may Katulad na Mga Pagtukoy sa Texas Instruments - TPA6011A4EVM

Katangian ng produkto Halaga ng katangian  
Manufacturer Texas Instruments  
Boltahe - Supply 4V ~ 5.5V  
Utilized IC / Part TPA6011A4  
Nabigyan na Nilalaman Board(s)  
serye -  
Package Box  
Katangian ng produkto Halaga ng katangian  
Type output 2-Channel (Stereo) with Stereo Headphones  
Max Output Power x Channels @ Load 3W x 2 @ 3Ohm  
Type board Fully Populated  
Base Number Product TPA6011  
Type amplifier Class AB  

Pag -uuri ng Kapaligiran at Pag -export

KATANGIAN PAGLALARAWAN
Katayuan ng RoHs Hindi maaari
Antas ng Sensitivity ng kahalumigmigan (MSL) 1 (Unlimited)
Maabot ang katayuan REACH Affected
ECCN EAR99
HTSUS 8473.30.1180

Mga bahagi na may katulad na mga pagtutukoy

Ang tatlong bahagi sa kanan ay may katulad na mga pagtutukoy sa Texas Instruments TPA6011A4EVM.

Katangian ng produkto TPA6011A4EVM TPA6013A4PWPEVM TPA6010A4EVM TPA6012A4PWPEVM
Numero ng Bahagi TPA6011A4EVM TPA6013A4PWPEVM TPA6010A4EVM TPA6012A4PWPEVM
Manufacturer Texas Instruments Texas Instruments Texas Instruments Texas Instruments
Type amplifier Class AB Class AB Class AB Class AB
serye - - - -
Boltahe - Supply 4V ~ 5.5V 4V ~ 5.5V 4.5V ~ 5.5V 4V ~ 5.5V
Base Number Product TPA6011 TPA6013 TPA6010 TPA601
Package Box Box Bulk Box
Nabigyan na Nilalaman Board(s) Board(s) Board(s) Board(s)
Utilized IC / Part TPA6011A4 TPA6013A4 TPA6010A4 TPA6012A4
Max Output Power x Channels @ Load 3W x 2 @ 3Ohm 3.2W x 2 @ 3Ohm; 235mW x 2 @ 16Ohm 2.7W x 2 @ 3Ohm 3.2W x 2 @ 3Ohm; 235mW x 2 @ 16Ohm
Type output 2-Channel (Stereo) with Stereo Headphones 2-Channel (Stereo) with Stereo Headphones 2-Channel (Stereo) with Stereo Headphones 2-Channel (Stereo) with Stereo Headphones
Type board Fully Populated Fully Populated Fully Populated Fully Populated

TPA6011A4EVM Datasheet PDF

I -download ang TPA6011A4EVM PDF Datasheets at Texas Instruments na dokumentasyon para sa TPA6011A4EVM - Texas Instruments.

HTML Datasheet
TPA6011A4.pdf

Mga Review ng Customer

Pagsusuri: 10 Artikulo

  • Jess***Jones
    2026/04/17

    It offers good value for the price, and the specifications match the description. I’ve been using it for two days with no issues, and I’ll definitely buy it again if I need it in the future.

  • Mich***Smith
    2026/04/17

    Shipping was on time, the component pins are neatly aligned, and I tested 10 of them with a multimeter—all readings were within the specified range. Highly recommended.

  • Aman***arris
    2026/04/3

    It was great—the entire process, from placing the order to receiving the package, went very smoothly. The components were consistent, the price was fair, and I had a very pleasant shopping experience.

  • Mike***nch
    2026/04/3

    Better than expected! The resistance and capacitance readings were spot-on, and it passed the test on the first try. The service was reliable, and the packaging was thoughtful—I highly recommend it.

  • Daic***K.
    2026/03/23

    Very good. No issue after long time testing.

  • Kevi***.
    2026/03/17

    Fast switching and stable output. Very satisfied with this IC

  • Daou***hekebkeb
    2024/06/16

    I had a great experience purchasing items from Allelcoelec, I recommend

  • Uri ***al
    2024/06/19

    Good comunication,
    Transpnt regarding the process and price.

  • Yaqu***l Ali
    2024/06/19

    Providing reasonable prices, regular follow-up of orders, providing accurate and regular invoices, timely delivery of goods, excellent customer service and providing original goods and best quality materials.

  • Lea ***
    2024/06/19

    Morrey was very helpful and right on top of things!
    He replied quickly to my RFQ. He was very courteous and professional.

Sumulat ng isang pagsusuri

Ang iyong email address ay hindi mai -publish.

Pagpapadala

Oras ng paghatid

Ang mga item na in-stock ay maaaring maipadala sa loob ng 24 na oras.Ang ilang mga bahagi ay isasaayos para sa paghahatid sa loob ng 1-2 araw mula sa petsa na ang lahat ng mga item ay dumating sa aming bodega.At ang Allelco ay nagbabawas ng order isang beses sa isang araw sa mga 17:00, maliban sa Linggo.Kapag naipadala ang mga kalakal, ang tinantyang oras ng paghahatid ay nakasalalay sa mga pamamaraan ng pagpapadala at patutunguhan ng paghahatid.Ang talahanayan sa ibaba ay nagpapakita ay ang oras ng logistic para sa ilang mga karaniwang bansa.

Presyo ng padala

  1. Gamitin ang iyong Express Account para sa Pagpapadala kung mayroon ka.
  2. Gamitin ang aming account para sa kargamento.Sumangguni sa talahanayan sa ibaba para sa tinatayang singil.
(Iba't ibang mga oras / bansa / laki ng pakete ay may iba't ibang presyo.)

Paraan ng paghahatid

  1. Pandaigdigang Pangkalahatang Pagpapadala sa pamamagitan ng DHL / UPS / FedEx / TNT / EMS / SF Sinusuportahan namin.
  2. Ang iba pang mga paraan ng pagpapadala, mangyaring makipag -ugnay sa iyong manager ng customer.

Mga Karaniwang Bansa Logistic Oras Sanggunian
Rehiyon Bansa Logistic Time (Araw)
America Estados Unidos 5
Brazil 7
Europa Alemanya 5
United Kingdom 4
Italya 5
Oceania Australia 6
New Zealand 5
Asya India 4
Hapon 4
Gitnang Silangan Israel 6
Sanggunian ng DHL & FedEx Charges Sanggunian
Mga singil sa Pagpapadala (kg) Sanggunian DHL (USD $)
0.00kg-1.00kg USD$30.00 - USD$60.00
1.00kg-2.00kg USD$40.00 - USD$80.00
2.00kg-3.00kg USD$50.00 - USD$100.00
Tandaan:
Ang talahanayan sa itaas ay para lamang sa sanggunian.Maaaring magkaroon ng ilang mga bias ng data para sa mga hindi mapigilan na mga kadahilanan.
Makipag -ugnay sa amin kung mayroon kang anumang mga katanungan.

Suporta sa Pagbabayad

Ang paraan ng pagbabayad ay maaaring mapili mula sa mga pamamaraan na ipinakita sa ibaba: Wire Transfer (T/T, Bank Transfer), Western Union, Credit Card, PayPal.

Ang iyong tapat na kasosyo sa supply chain -

Makipag -ugnay sa amin kung mayroon kang anumang mga katanungan.

  1. Telepono
    +00852 9146 4856

Mga Sertipikasyon at Membership

Tingnan ang Higit pa
TPA6011A4EVM Image

TPA6011A4EVM

Texas Instruments
98D-TPA6011A4EVM

Gusto mo ng isang mas mahusay na presyo? Idagdag sa CART at Isumite ang RFQ ngayon, makikipag -ugnay kami kaagad sa iyo.

0 RFQ
Shopping cart (0 Items)
Wala itong laman.
Ihambing ang listahan (0 Items)
Wala itong laman.
Feedback

Mahalaga ang iyong feedback!Sa Allelco, pinahahalagahan namin ang karanasan ng gumagamit at nagsusumikap upang mapagbuti ito nang palagi.
Mangyaring ibahagi ang iyong mga komento sa amin sa pamamagitan ng aming form ng feedback, at agad kaming tutugon.
Salamat sa pagpili ng Allelco.

Paksa
E-mail
Mga komento
Captcha
I -drag o mag -click upang mag -upload ng file
Mag -upload ng file
Mga Uri: .xls, .xlsx, .doc, .docx, .jpg, .png at .pdf.
MAX SIZE SIZE: 10MB